Who This Project Is For
Restaurateurs, cafe operators, and hospitality franchise owners fitting out commercial dine-in and cloud kitchen venues across Indore's retail hubs, including AB Road, Vijay Nagar, New Palasia, and Bhawarkua.
For dedicated client planning support, visit our Architects & Interior Designers Portal.
Typical Execution Scope
Project execution brings together coordinated trade disciplines under approved site drawings and specifications:
- Commercial Kitchen Civil & Wet Prep: Heavy-duty non-slip floor tiling, floor drainage channel setting, and multi-layer wet-zone waterproofing.
- Ventilation & Exhaust Infrastructure: Commercial stainless steel exhaust hood mounting, duct runs, inline exhaust fan integration, and makeup air systems based on approved HVAC plans.
- Grease Management & Drainage: Dedicated sink drainage routing to commercial grease interceptors prior to municipal sewer discharge where specified by plumbing plans.
- Commercial Electrical Distribution: Electrical load distribution, dedicated motor control circuits for refrigeration and exhaust fans, and isolated circuits for dining lighting based on approved drawings.
- Dining Area Joinery & Finishes: Partition walls, ceiling grid framing, banquette seating fabrication, and architectural lighting.
Statutory Compliance & Specialized Equipment Boundary
All commercial gas manifolds, kitchen exhaust CFM/static pressure systems, grease interceptors, and 3-phase electrical boards follow approved MEP plans and municipal/fire regulations. Trade coordination supports installation according to approved drawings; statutory licenses and formal certifications are issued by jurisdictional authorities.
Participating Trade Categories
HandyFabricator coordinates participating canonical trade categories for this project scope in Indore:
Coordination Stages
Sequenced milestones ensure cross-trade alignment and rigorous inspection before subsequent finishes are installed:
Stage 1: Boundary Verification & MEP Alignment
Site handover, core boundary verification, and MEP layout coordination.
Stage 2: Kitchen Civil Drainage & Containment
Kitchen drainage channeling, grease trap line routing, and electrical containment drops.
Stage 3: Wet-Area Waterproofing & Duct Hanging
Kitchen waterproofing, wall tiling, and exhaust hood suspension.
Stage 4: Dining Carpentry & Ceiling Closure
Dining area partition carpentry, false ceiling grid, and HVAC duct closure.
Stage 5: Equipment Hookup & Commissioning
Equipment connection hookups, lighting fixture commissioning, and cosmetic detailing.
Customer Preparation & Specification Decisions
Drawings & Technical Inputs
- Professional MEP layout (electrical single-line diagrams, plumbing schematics, HVAC duct design).
- Kitchen equipment schedule with kilowatt ratings, gas consumption (BTU/kW), and water/drain inlet positions.
- Local authority submission drawings and building management guidelines.
Material & Scope Decisions
- Kitchen flooring material (epoxy flooring vs vitrified anti-skid heavy tiles).
- Exposed ceiling ductwork styling vs enclosed acoustic ceiling tiles.
- Centralized commercial LPG manifold bank vs pipeline gas connection.
Project Quality Checkpoints & Handover
Inspection Checkpoints
- Slope inspection of kitchen drain channels to grease trap inlets.
- Insulation resistance testing on commercial electrical distribution boards.
- Static pressure and joint inspection of kitchen exhaust ducting prior to ceiling enclosure.
Handover Documentation
- MEP as-built distribution drawings and panel labeling schedules.
- Grease trap cleaning protocols and exhaust hood filter maintenance schedules.
- Manufacturer operation manuals for exhaust blowers, pumps, and electrical breakers.
Relevant Specialists, Technical Guides & Projects
Trade Specialists
Relevant Technical Guides
Related Project Scopes
Plan Your Project in Indore
Coordinate your restaurant fitout in Indore. Share your approved MEP and architectural layout to schedule experienced commercial fabrication, plumbing, and electrical teams.
Enquire About This Project Scope